Brett departed at the beginning of the week, but not before deciding that it would be a good idea to christen the BBQ in the midst of the building site.
 

 
Most of the guests brought drinks and a variety of salads to complement the delicious cat food!





 
 
It has been a very wet week and the gargoyles have been doing their bit to keep the verandas dry.





Speakers have been appearing in every nook and cranny.
 
 
The kitchen unit fittings continue to demand deep thought and patience.

 
The pool veranda mouldings have received their undercoat and await the final covering.

 
A scaffolding free front of house!!!

 
Kenrick & Sabina discuss plans for the completion next week of the main entrance stairs.

 
A trench has been dug to take the electrical conduit to the main gate and drive lights.


The pebbled floor of the pool wet room has been grouted and the centre strip of the back wall completed.


 
Metallic washers have been fitted to the back of the Tower stairway lights. 



The store room beneath the kitchen has been cleared out and the floor concreted to provide a dry home for the AV system woofer.
 

The beds constructed last week by Shevran & O'Neal are now in situ in Guest Bedroom 1

 
The Guest Bedroom 2 bed has been unpacked and installed.
 
 
The knots for the master swinging bed have been finally tightened and trimmed.

 
A new mask has appeared on the Master Bedroom wall and brass knobs fitted to the folding doors.


 