can remember for many years.
Most of the work this week has been inside, however the footings for the BBQ steps have been dug and await the final design.
Anthony continues to plaster the areas in need of finishing.
The decision has been taken to install an immersion heater to provide hot water rather than a solar powered system so the plumbing work has been removed and the area plastered.
The 'wet room' concept for the Guest En-suite bathrooms- shower walls have been designed & are beging installed.
Shevran has started to fix the skirting boards in the Lounge, Entrance Hall and Master Bedroom.
Here, the green heart louvres above the Guest Bedroom doors have been put in place.
The main focus this week has been on the tiles for the Guest Bedrooms ......
... and the insertion of the leaf detail as designed by Brett & executed by Sabina.
The team added their creative input when the inlays where being decided.
The tiling for the Studio Flat has been continued the lack of rectangular tiles has meant the larger square tiles are being cut down into the smaller rectangles .
And finally, the sides of the Tower stairs have been dry walled.
My apologies to Sabina for the loud music and general mayhem into the early hours and for the resultant poor quality of this edition of the Blog!