Sunday, 14 September 2008

WEEK 19 - PUMP ROOM APPEARS & BEAM CAST

Week 19 has seen steady progress with only short delays for rain. Thankfully, all the 'named' weather systems have passed to the north.


General views of the exterior including the pool shower/loo.

The major push this week has been the casting of the footings and blockwork for the Pump Room ready for the arrival of the first consignment of wood.



The second major task was the casting of the beams to support the Master Bedroom. It was a long way up and all the material had to be carried in buckets!!





Kenrick has been putting together the form-work in preparation for the casting of the 2 main columns.


The Team have had a major clean up in the Studio Flat .......

and the plastering has been completed following the removal of the final pieces of form-work.


The neighbours are still trying to keep up with the Team ......
and the Pink Castle, not to be outdone, are building a tower of their own!!!