Friday, 30 March 2012

WEEK 204 - DOWN PIPES GALORE

The main push this week has been the fitting of the gutter down-pipes.









If it ever rains again, the down-pipes will feed the rain water into the 2 house cisterns which have been cleaned and coated with Nitocote 210.


Elsewhere, the pressure washing of the roof tiles is almost complete,




the sanding of the Guest Room railings continues,


and a trench is being dug to house the electrical conduit .....


which will carry current to the 2 gate posts and driveway lighting.


The door for the Generator Room is under construction.


The electrician has been in evidence this week fixing the electrical outlets.