WEEK 201 - BRETT'S IN TOWN

The copper guttering has commenced installation.

The drive walls have received the white top coat.

Wood has been inserted into the Master Bedroom landing.

The speaker stands have been fitted into the columns on the main entrance veranda.

The fittings for the access hole into the water cistern has been permanently fixed.

The painters have concentrated on the pump room area.




It has transformed the front view of the house.

The work tops are in place in the Studio Flat kitchen and tiling has commenced.




The bathroom (house) is now complete.


 

The edge of the step from the Studio Flat has been moulded.