Friday, 23 March 2012

WEEK 203 - ROOF CLEAN

The dry season has arrived at last.
The stone-work on the steps outside the Studio Flat has been completed.

The copper gutters are all in place and await connection to the down pipes after the roof tiles have been cleaned.


The roof cleaning team in operation.



Here, Shevran is plastering the small wall outside the main entrance.

Meanwhile O'Neal is cutting steel for the gate post columns.

The form work in place for the gate post columns.



A hole is being dug in anticipation of the arrival of the pole for the mains power.
Shevran checking the pole is secure

Another make-shift wheel barrow!!


Random.