While the sun keeps shining, Sabina works hard on the annual accounts from her improvised office in the crowded guest bedroom.
The railings around the main entrance veranda are being sanded in preparation for resealing.
The scaffolding has returned to the lounge for the painters to apply the finishing touches.
Here, Kenrick ponders the removal of a piece of unwanted rock ........
... and attempts the traditional Lucian method of fire followed by cold water. Sadly, the heat generated by disused cement bags was insufficient. Now where's that Hilti?!
The path outside the Studio Flat door has been cast.....
..... and Guy has returned to put in place the light fittings.
The drive wall has been painted .....
.... and Alex has manufactured the exhaust system for the generator.
The bath fitting is standing proud.
Here the complicated plumbing for the bath between the bedroom floor and kitchen ceiling.
The walls at the top of the Tower have been painted.
The first of many empty crates?!
Random walk-bys.
No comments:
Post a Comment