High winds and some rain but good progress.
Sabina selecting her tools for the day's tasks ......
.... then removing the form work from the BBQ ........
and surveying her handy-work.
The detail on the BBQ shelves is very effective.
The bath is being prepared for placing in the corner of the Master Bedroom, with the fixing of the water delivery pipe requiring much deliberation.
Sikkens, Sikkens, and more Sikkens.
Blocks and mortar to surround and protect the generator.
The copper sink is positioned in the Studio Flat......
....... and the cast work surfaces for the kitchen are ready to be polished.
The recent 'Christmas Winds' have blown many leaves and much rubbish into the pool.
Shevran mixing the plaster ......
for the the Hall veranda.
O'Neil is entrusted with ensuring it is level.
Although not quite as cold as it is in the UK right now, Jumbo 1 still needs to be kept warm!
No comments: