The weather remains unseasonal with long, very hot days and no appreciable rain for 3 weeks.
There has been minor work carried out on small inserts to the rafters and ridge beam.
However, everyone else has been employed on the erection of the Mora ceiling.
The temporary Mora workshop.
The inside of the north facing east roof .........
....... and the lounge veranda.
The Team working on the outside.
Having laid the boards, the wood is treated to deter termites, and then covered with roofing felt and laths/battens fitted to take the clay tiles.
Work on the other side of the roof section is more advanced.
A long range zoom shot with shaky hand!