The various finishing tasks have continued this week.
The brackets for the master bed have been fitted with the metal inserts .....
....... and 2 are now in place.
A close-up of the fitting for the Guest Room bunk beds reported last week.
Shevran & O'Neal have fitted new rollers to the Lounge veranda doors.
New light fittings and fans have appeared .....
.... and when Guy inserted the magic screwdriver into the middle floor circuit breaker box there was a profusion of light!!!!
The fibre optic lights illuminating the Tower stairs were particularly decorative as they changed colour from blue to green to yellow, however Sabina explained that this circuit was designed for the pool and a change of control box was required!!
Stephan (Tweety) added mortar & cut to the last ridge tile to correct the point.
Stephan (Tweety) added mortar & cut to the last ridge tile to correct the point.