A full week's work with Sabina arriving home and Brett departing for the wonderful English summer. But was he really here? Didn't hear the wailing didgeridoo echoing around the Bay once, however the soft put-put of his ATM - All Terrain Moped - meandering between the local water holes was a bit of a giveaway!
Plumbing has been the main theme this week. The mains feed was discovered, but only after digging through the concrete and stone of the outside stairway.
The path of the waste pipe to the septic tank.
Shevran & O'Neal have been making doors for the AV cupboard .......
drilling holes in the bed frame to take the supporting rope .....
..... and hanging the completed internal door for the walk-in wardrobe.
Guy has been on-site fitting switches & dimmers.....
The outside store room is now cleared to facilitate plumbing fittings & make space for the pool tiles.
The mahogany arches have been re-sealed and the walls re-painted.
Owin priming the kitchen cupboard doors for the Studio Flat.
Passing shots - Big Brother is watching you.
Not smiling yet, but maybe a hint beginning to appear?
Will the kitchen ever appear from amongst the boxes?
After a prolonged dry period, it has just started raining which means it must be carnival weekend! Therefore a short working week ahead with some spectacular hang-overs.