Only a 2 day working week as the team took a break for 3 days between Sabina's departure and Brett's arrival on island.  Therefore a shorter than normal episode.

O'Neal and Shevran are constructing the internal door for the walk-in wardrobe in the Master Bedroom.



The master bed frame awaits the supporting slats for the mattress.


Whose been sleeping in my bed!!!


The mahogany arches are being sanded prior to re-sealing.





The best news is that the water pump has been connected .....



.... and there is water in the Master Bedroom en-suite taps!


Evidence of forthcoming plumbing everywhere ....


... but uncertainty as to the position of the external pipe supplying water to the lower floors.