After their break, the small team were back to work in bright, sunny conditions.
Prior to the time-out, the shutters were fitted to the windows at the front of the house.
The lounge veranda has been converted into a secondary workshop where Shevran and O'Niel are constructing the frames for the mosquito covers over the windows.
Work has started on the laborious task of cleaning the external stonework with a wire brush!
Meanwhile, Owen and Stephen are still in the rafters with the ever present cans of Sikkens HLS.
No comments:
Post a Comment