This week more windows and doors have been delivered.
As it wasn't raining for a change(!), I took an external shot of the arched windows in the Lounge.
More wooden steps have been prepared for the Main Entrance stairway.
The tiling in one of the Guest Bedrooms is now almost complete.
The BBQ area and steps are looking good.
The tiling of the Lounge veranda has commenced.
The masons have been plastering the 2 main columns at the front of the house.
At long last, Kenrick has started work on the the ridge. Coloured concrete is being used to create a continuous strip and then lines carved into the wet material to give the effect of individual tiles. It is a long and laborious task, but the completion of the roof is long overdue as the lathes, roofing felt and internal rooms have been getting wet for some months now.