A short episode this week as I have a severe hangover - our apologies to Sabina for the loud and raucous party last night/earlymorning!
The Studio Flat bathroom has been plumbed in.
The doors for the cupboards are painted ......
....and the trench dug for the waste pipes.
Shevran & O'Neil have been constructing the form work for the Studio Flat kitchen units.
The railings and pillars on the lounge balcony continue to receive attention prior to re-sealing.
The decorative feet have been fixed.
The tiles were removed from around the Tower, the roof re-rendered, the tiles replaced and sealant placed on top in an effort to cure the longstanding water leak.